Work on Orange Line Metro Train Started in Lahore – Shahbaz Sharif
Officially Inauguration by Nawaz Sharif soon
Lahore (Wed, Sept 9, 2015) – Yesterday Chief Minister of Punjab Muhammad Shehbaz Sharif presided over a meeting on Lahore mass Transit orange line metro train. This will 27 K long track with 26 train station. In this metro train 24.3 kilometer track will be elevated on head and 1.7 kilometers track will be underground.
Almost 2.5 Lac peoples will travel on this metro rail daily from Multan Road Ali Town to Dera Gujraan in North-Eastern Lahore. This project will revolutionize the transport sector in Pakistan.
