Monday , September 14 2026

Nawaz Sharif Inaugurates Dasu Dam/Hydro Power project

Nawaz Sharif Inaugurates Dasu Dam/Hydro Power project

Total Capacity of Electricity generation = 4230MW

Located on Indus River and Karakoram Highway

Dasu-Khyber Pakhtunkhwa (Wednesday, June 25, 2014) – A millstone in the journey of Pakistan’s cheapest power projects. Prime minister of Pakistan has inaugurated the work on long awaited power house plus dam at Dasu.
It will generate 4230 Mega Watts of electricity after completion. In its fist phase It will start to supply in national grid of 2160 MW in next five years (in 2019).
After Terbela and Mangla Dam it will the biggest achievement in the history of hydral power generation.
It is located along the karakoran highway.

Diamer-Basha Dam is another Power Project being built near Chilas in the Diamer district. Its area consist of both khyber Pakhtukhwa and Giligit Baltistan.

Diamer-Bash Dam Location Map near Chilas City
Diamer-Bash Dam Location Map near Chilas City

It is estimated that Pakistan can generate almost fifty thousand (50,000) Mega Watts electricity by utilizing the potential of Indus River.

Dasu Dam Location Map - Between Chilas and Besham City
Dasu Dam Location Map – Between Chilas and Besham City
Daso Hydro Power Project - Stream Gauging Station
Daso Hydro Power Project – Stream Gauging Station
Prime Minister Nawaz Sharif along with Water and Power Minister Khawaja Asif inaugurating the Dasu hydro power project on June 25, 2014
Prime Minister Nawaz Sharif along with Water and Power Minister Khawaja Asif inaugurating the Dasu hydro power project on June 25, 2014

Prime Minister Mian Muhammad Nawaz Sharif along with Mnister of Water and Power Khawaja Muhammad Asif is inaugurating the Dasu hydro power project on June 25,  2014.

About Tahir

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.